Network the remedial builder, has been called into rectify the water leaks on a poorly constructed unit block in Gosford. Due to non compliance in construction. As you can see in the photos no care has been taken in the wall construction. Non compliance issue must be rectified. Water entry through Dincel wall. An attempt to rectify the works with a membrane on the outside of the wall. Incorrect frame detail around the window and plasterboard glue fixed to Dincel wall system.


3 views0 comments

Recent Posts

See All

Network the remedial builder has been engaged for the multi storey window leaks at Breakfast point strata block. The Network team were selected over other remedial professionals for the works. Once ag

Network the remedial builder have been engaged for the concrete cancer repairs to unit 24 located in Drummoyne NSW. The Network team have completed testing and inspection holes to confirm the deterior